The term PCB assembly refers to a fast prototype PCBA used to test the function of new electronic designs. These help with quality assurance, verifying that there is no problem with the test product, finding bugs, and updating the design. Typically, before mass production, one electronic project will need 2-3 iterations of an SMT assembly to make sure everything is working perfectly.
Mass production lead time
lead time Level | Lead Time (Wroking days,ex-factory | |
Urgent(hours) | Normal(days) | |
≤5pcs | 12 | 2-3 |
10-100PCS | 24 | 3-4 |
The above lead time is based on:
1.Conventional Material
2.All engineering consultations is confirmed
Our Newsletter