Mass production lead time
| lead time Level | Lead Time (Wroking days,ex-factory | |
| Urgent(Days) | Normal(days) | |
| 1、2L | 8-12 | 13-15 |
| 4L | 12-15 | 17-19 |
| 6、8L | 15-19 | 20-23 |
| 10L and up | To be determined based on case | |
The above lead time is based on:
1.Conventional Material
2.All engineering consultations is confirmed
Our Newsletter